Customer Success Stories

Proven by real-world projects, serving multiple industry-leading enterprises.

GMP Cleanroom Engineering for a Leading Pharmaceutical Company
Pharmaceutical Industry

GMP Cleanroom Engineering for a Leading Pharmaceutical Manufacturer

Suzhou, Jiangsu
2025

The client needs to build an oral solid dosage production workshop compliant with the latest GMP certification standards. The facility requires ISO Class B background with ISO Class A local protection, along with extremely precise temperature and humidity control (temperature: 22±1°C, humidity: 45±5%).

GMP CertificationClass B Clean AreaConstant Temperature and Humidity
Tertiary Hospital Operating Room Purification System Renovation Project
Healthcare

Grade 3A Hospital Operating Room Purification System Renovation Project

Beijing
2025

The hospital's existing operating room purification system has been in operation for over 10 years. Due to equipment aging, the air cleanliness levels are below standard and noise exceeds limits. The renovation must be completed without disrupting scheduled surgeries.

Operating Room RenovationClass 100 laminar flowLow Noise
Semiconductor Packaging and Testing Cleanroom Project
Electronics Industry

Semiconductor Packaging and Testing Cleanroom Project

Shanghai
2024

A client is launching a new semiconductor packaging and testing production line, requiring a 5000 sqm Class 1,000 cleanroom with localized Class 100 areas. Strict controls are required for micro-vibration, static electricity, and energy consumption.

Class 1000 CleanroomAnti-staticEnergy-efficient design
Dairy Plant Filling Workshop Purification Project
Food Industry

Dairy Plant Filling Workshop Purification Project

Inner Mongolia
2024

High humidity and low temperatures in the dairy filling room cause standard filters to degrade. The facility must meet HACCP certification requirements with strict microbial control.

Moisture-proof designHACCPStainless steel
Biosafety Level 2 (BSL-2) Laboratory Construction Project
Laboratory

Bio-Safety Level 2 Laboratory Construction Project

Shenzhen, Guangdong
2025

The client is building a pathogen research laboratory requiring BSL-2 biosafety certification. Strict controls are in place for negative pressure, waste gas treatment, and personnel protection.

P2 LabNegative Pressure ControlBiosafety
Data Center Cleanroom Air Purification Project
Electronics Industry

Data Center Air Purification Project

Guizhou
2024

Large data center facilities have expansive floor areas and high equipment heat loads, requiring dust control while ensuring efficient air conditioning system operation. Construction must be performed without service interruption.

Data CenterOnline MaintenanceCost reduction and efficiency improvement

Why Choose Us?

28+
Years of industry experience
500+
Cleanroom Project
1000+
Partner Customers
98%
Customer Satisfaction
津ICP备2026010675号-2|津公网安备12011402001761号